Contact Us

Call UsEmail Us
Concrete cutting before demolition icon

Concrete Cutting Before Demolition

Isolate what stays. Then the machine can take what goes.

Some knockdowns need a saw cut first. A path that has to stay, a neighbouring slab, a section the builder is keeping. We cut the line so the excavator does not take the wrong concrete.

Concrete Cutting Before Demolition – Elite Demolition & Excavation Sydney & Central Coast

From first look to handover

  1. 01

    Mark what stays

    The stay-line is agreed before anyone books the excavator on that edge.

  2. 02

    Cut it

    A saw cut isolates the section. The machine then has a line it can work to.

  3. 03

    Then the take

    Demolition can start on the side that is coming down.

How this job runs

This is not the asbestos stand-down and it is not the house take. It is the cut that stops a machine from walking through a slab someone still needs.

The knockdown itself sits on house demolition. Asbestos, if it is in the building, still happens before the excavator.

We inspect, then we quote. Call 0487 549 909 or send the suburb and a couple of photos.

Other concrete cutting work

Concrete slab cutting

Openings, stair wells, and controlled cuts in a slab that has to stay.

Concrete wall cutting

A clean opening in a wall that is not coming down.

Driveway and path cutting

Cut out what has failed. Leave the pavement that still works.

Back to Concrete Cutting

This sits under Concrete Cutting. If the job also needs another trade on the same site, say so on the quote. We inspect, then we quote.

Read the concrete cutting page

Ready to get started?

Send the suburb, a short note on the concrete cutting before demolition, and a couple of photos. We look at the site before we put a number on it. Call 0487 549 909 or use the contact form.

Concrete cutting before demolition FAQs

Why cut concrete before a knockdown?

To isolate a slab, path, or neighbouring edge that has to stay. The excavator then has a line.

Is this the same as asbestos removal before demolition?

No. Asbestos is a stand-down and a clearance. This is a saw cut so the machine does not take the wrong concrete.

Locations We Serve